Pusat Data Sektor BEI Data

Background

The Building Energy Intensity (BEI) Benchmarking Project is a project funded by the Malaysia Electricity Supply Industry Trust Account (MESITA) under the Ministry of Energy Transition and Water Transformation (PETRA). The project aims to establish national guidelines for BEI Benchmarking, develop a BEI database, create reporting guidelines, and formulate energy ratings for buildings in Malaysia. Stakeholders participating in the project can benefit by being continuously updated on EECA requirements, taking part in shaping BEI tools, mobilising resources and gathering essential data to prepare for compliance to the Energy Efficiency and Conservation Act (EECA), and taking the lead in gaining competitive advantages through energy efficiency.

Building Type

Purpose built - (Public Data Centre & Private Data Centre) - Excludes the scenarios where server room is housed in small rooms within buildings

Date Needed

For any inquiries, please feel free to contact us at +6017-870 3190 (Asraf). All received data will be kept strictly confidential and solely used for the purpose of this BEI study only.

Please provide the energy data below for the year 2023. This data is needed to derive the building energy intensity (BEI). To derive a BEI, the electrical and thermal energy consumption data, as well as the building floor area are needed.

Energy Data Required for the Year 2023

Building Floor Area terminologies definition:


*PUE category 2 shall be used whereby the IT equipment energy will be measured at PDU output.
*Where energy consumption at PDU output is unavailable, IT equipment energy shall be measured at UPS output [PUE category 1] and apply electrical loss for PUE category 2 calculation accordingly.
*WUE = Annual Water Usage/ Annual IT equipment energy consumption
*WUE is the ratio between the use of water in data center systems (water loops, adiabatic towers, humidification, etc.) and the energy consumption of the IT equipment.

The utility provider information is needed for the government to plan a more efficient data collection method in the future.


Electricity Provider

Renewable Energy Provider

District Cooling Plant Provider

We require the energy saving measures data to complement our BEI data collection process, ensuring comprehensive analysis and accurate insights into energy consumption patterns. Please select energy saving measures that has been implemented in your building.


Does your building employs any of the following energy saving measures:

The Power Usage Effectiveness (PUE) can be calculated by using the following equation:

Based on the data provided, following is the value of PUE at you current IT load for your building:

Note: The PUE value presented above is calculated from the input data furnished in Section B, along with default energy conversion values for fuel and chilled water. It's essential to recognize that while this PUE value serves as a valuable reference point, it does not conclusively determine the final assessment of your Data Centre's PUE.

Notes & Comments

Please use the space below to provide any notes or comments regarding the data collection process or to express any concerns you may have about the provided data. For example, if you are unable to provide certain thermal data information.

ms_MYMS

Please confirm

Are you sure you want to navigate away from this page? All data you have made for this form will be lost.

Well Done!

Your form data has been successfully submitted! Thank you.